Big improvements for the Big Street

The turn area at the end of the big street has been closed to through traffic and re-graded.

The aim of the resurfacing and closure is to:

  • Reduce the quantity and speed of traffic in the lane
  • Improve safety for the residents and village children.
  • Remove the large potholes and provide water run-off.
  • Slow the breaking up of a repaired surface

ResurfacedResurfaced

For more info see the Project Page : January 2012 – Resurfacing of the Big Street Turn Area